城市地下管线普查工程管理探讨

Discussion on the Engineering Management of General Survey of Urban Underground Pipeline

  • 摘要: 城市地下管线普查是一个牵涉多专业技术学科、多重工序以及众多单位和部门参与与协调的系统性工程,文章以工程施工的先后顺序,阐述了前期准备、外业施工、内业数据处理以及资料整理阶段的主要工作内容。重点探讨了工程施工阶段的物探技术方法,并对施工过程中的疑难问题,提出采用综合物探方法的解决方案,强调了质量控制的重要性和实行工程监理机制的必要性。最后对普查后期的动态管理模式提出建议,对城市地下管线普查的开展以及动态管理工作有很好的借鉴作用。

     

    Abstract: The general survey of urban underground pipeline is a systemic engineering, which is involved with many institutions, departments, specialties and processes. Based on the sequence of engineering construction, this paper elaborates the main work contents of the related units in the preliminary preparation stage, field construction stage, office data processing and data sorting stage. The geophysical exploration technology and methods used in the construction stage of the project is discussed. The solutions to the difficult problems encountered are put forward in the construction process of the project by adopting the comprehensive geophysical exploration method. The importance of quality control and the necessity of implementing engineering supervision mechanism are emphasized. Finally, some suggestions are put forward for the dynamic management mode in the later stage of the general survey. The conclusions and suggestions can be used for reference in the general survey of urban underground pipelines.

     

/